User Tools

Site Tools


livable-lynchburg-someday-maybe-list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
livable-lynchburg-someday-maybe-list [2025/06/21 17:58] 172.58.241.192livable-lynchburg-someday-maybe-list [2025/12/04 21:54] (current) 172.58.245.168
Line 20: Line 20:
     - Walkability audits of neighborhoods     - Walkability audits of neighborhoods
     - Get branded vests     - Get branded vests
-    - Change twitter handle from urbanlynchburg to something more appropriate 
     - Get better sidewalk edging tools     - Get better sidewalk edging tools
     - Database of bushes that get overgrown often     - Database of bushes that get overgrown often
Line 33: Line 32:
     - Set up a friendly front end to Lynchburg Road Issues like this: https://strongnorthtahoe.org/take-action/report-a-problem-in-north-tahoe-see-it-share-it-fix-it/ (based on https://www.open-user-map.com/)     - Set up a friendly front end to Lynchburg Road Issues like this: https://strongnorthtahoe.org/take-action/report-a-problem-in-north-tahoe-see-it-share-it-fix-it/ (based on https://www.open-user-map.com/)
     - Move the wiki to something nicer like MediaWiki     - Move the wiki to something nicer like MediaWiki
 +    - Make some goal related to planting trees. Trees are such an amazing investment, unlike most "investments" cities make. 
 +    - Friendly submission form for Lynchburg Road Issues 
 +    - Make a near-miss reporting dashboard like https://nearmiss.planrva.org/dashboard 
 +    - Get sandwich signs to put outside when we have a meeting 
 +    - Evaluate Thunderbird Appointments for meeting RSVPing once it gets out of beta https://appointment.day 
 +    - Advocate to update subdivision ordinance to always preserve 10' ROW for possible bike path at end of culdesac regardless of how short the road is. Current one says you only have to have through-road if road is a certain length before cul-de-sac, but I think at least 10' should be preserved always. 
 +    - Apply for a [[virginia-walkability-action-institute|VWAI]] grant to do a small project 
 +    - Apply for a public works permit to "close" part of the street to make a temporary protected bike lane or curb bumpout 
 +    - Design a network of bike boulevards and get signage put up. Include Euclid Avenue, Park Place, and Rose Lane stretch for sure. 
 +    - Read through GLTC transit development plan https://gltconline.com/wp-content/uploads/2025/04/GLTC-Strategic-Plan-FINAL-05-13-20.pdf 
 +    - Get stepstools or tiny ladders for applying bus route stickers on tall signs 
 +    - Plant some fruit trees along the street. Thundercloud Plum maybe? 
 +    - Evaluate whether removing diversion down Church St. would make route 3A better overall. Timed how long it took to go around that hairpin and it was 3m 50s. Going straight on 12th and making left onto Main would probably take 30-60 seconds.
  
livable-lynchburg-someday-maybe-list.1750528686.txt.gz · Last modified: 2025/06/21 17:58 by 172.58.241.192