======Lynchburg Department of Public Works===== [[https://www.lynchburgva.gov/public-works|Official website]] =====Contractors===== * [[counts-and-dobyns-inc|Counts and Dobyns, Inc.]] (sidewalks) =====Informal Policies===== These are informal policies that we have been told exist or have inferred must exist * Only use high-visibility (continental) crosswalks over higher-speed roads (probably >=30mph or >=35mph). Use transverse line crosswalks for side streets of these higher-speed roads. * When bike lanes are painted on a road, end the bike lanes somewhat before a major intersection. End the lanes on both sides even if there is space for a bike lane in one direction and sharrows in the other. * Charlotte Lester at CVPDC said that there are only certain "shapes" or "geometries" that the city can do by itself without hiring a consultant. Where are these geometries defined and what qualifications are needed to do other geometries? Green book thing?